sorry i come again because i try to make a small network plan to control a a different step of my Project. Please I'm confuse. I receive it for the compagnie where i'm doing my stage. it will be walk for example like this:
Step1_StandUp(Parameter Bigin, Duration, Ende)
"Step2 and Step3 depent of the Step1 and can only bigin when step1 is finished"
Step2_speak(Parameter Bigin, Duration, Ende)
Step3_HandUp(Parameter Bigin, Duration, Ende)
"Step4 depent of the Step2 and Step3 and can only bigin when step2 and Step3 are finished"
Step2_speak(Parameter , Bigin, Duration, Ende)
please can somebody guide me or help me how i can do forward.
I already make a database my 4 table don't have any connection each another so i can be free to change the order. in my WinForm.