|
I can do a dump of the actual comments and actual points if you wish. I ran the actual query - I'm not telling porkies.
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
I wasn't inferring that you were.
I am just pretty sure that there is a problem, if not general, then specific to me.
Oh Woe is me...
------------------------------------
I will never again mention that I was the poster of the One Millionth Lounge Post, nor that it was complete drivel. Dalek Dave
CCC League Table Link
CCC Link[ ^]
|
|
|
|
|
Can some CP Admin help this guy[^]?
Adding to this issue, he asked the same thing sometime back and I replied by asking him to uncheck the 'Work In progress' checkbox.
In case, if it is no more there, can we have something like dummy workflow/template to play with and see how things look and work - this would help us to understand the flow and have easy submission.
|
|
|
|
|
IMHO too many different words are used that may or may not intend to mean the same, example: composing, unfinished, work in progress, don't show publicly.
My suggestion is twofold:
1.
assign a single "publishing status" to each and every article, always show it (near the first posted info), and add a little "?" button there, which when clicked pops up a list of all possible statuses, in normal chronological order, with a short description of what they are and how one moves to the next. Yes, I know most articles will show the same "finished" or whatever status, I don't care, I do care about too many people having trouble not seeing their article when and where they expect to see it.
2.
streamline the terminology, i.e. reduce the synonyms to one, synonyms are no good outside literature, all they do is confuse people.
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
|
|
|
|
|
Can you tell me why I have got -50 for consumption of technical blog?
|
|
|
|
|
Did you add, then remove, a technical blog? You get 50 points for having a blog, but you lose those points if you remove the blog.
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
I get 50 points for adding a blog!?
How many blogs can I create? Per day? Per year?
|
|
|
|
|
Before reporting a problem I can see, I would like to say I can see that intensive work on improving the functionality of the site is going on. Thank you very much!
I noticed that with time, some comments to the same Answer changed their orders. This is very confusing. They come ordered by the time of posting and should stay this way because this reflects a time line of conversation, arguments, etc.
Thank you for understanding.
Sergey A Kryukov
|
|
|
|
|
Give us a day or so. We're finalise some nice additions to the comment system.
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
To help with the confusion: you can choose the order manually.
There's a tab 'Top rated', which sorts based on popularity votes and there's a tab 'Most recent', which sorts reversed chronologically.
modified 13-Sep-18 21:01pm.
|
|
|
|
|
yes, there now is more confusion; I'm afraid you're talking about the order of the answers, not the comments.
Luc Pattyn [Forum Guidelines] [My Articles] Nil Volentibus Arduum
Please use <PRE> tags for code snippets, they preserve indentation, improve readability, and make me actually look at the code.
|
|
|
|
|
I talk about order of comments to the same answer (please my initial request see above)
Sergey A Kryukov
|
|
|
|
|
I am unable to find the delete button. Could the site moderators please help me with this.
Thanks.
|
|
|
|
|
I got a email saying my account is de activated. What does it mean? I can still make posts. Could my account not be deleted like of those who are spammers or trolls? Please delete it.
|
|
|
|
|
Why?
Have we upset you?
------------------------------------
I will never again mention that I was the poster of the One Millionth Lounge Post, nor that it was complete drivel. Dalek Dave
CCC League Table Link
CCC Link[ ^]
|
|
|
|
|
You may like to check GIT for his last few conversations.
..Go Green..
|
|
|
|
|
Not the Rest of the world but the Indians.
Sorry Dave, We Indians dont take criticism well. We should always be praised even if we dont desefve it.
On a serious note, IMHO he thinks, he is above everyone.
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
super wrote: Not the Rest of the world but the Indians.
Sorry Dave, We Indians dont take criticism well. We should always be praised even if we dont desefve it.
On a serious note, IMHO he thinks, he is above everyone.
That was really uncalled for. What do you mean I don't take criticism well. I have several posts that are absolutely thrashed before. Even my article has been bashed by some people who think they are above everyone else. I have never cried over down votes etc. In fact I am one opf those who find such trivialities disgusting. Don't make bold statements on people you hardly know. That just shows that you think you are above everyone else.
|
|
|
|
|
Then why the heck is so much noise from you.
Just ignore all, send the email to chris and co and keep mum.
Its all started when your post( with curse words) was removed my GIT members. So just wind up and relax.
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
How many times do I have to admit that asking people if at all deleting an account was possible was a HUGE mistake? Yes, I was stupid to ask people about that. I admit I was stupid. Now, I'll stay mum only if you let me be, without making provokative posts.
|
|
|
|
|
Peace be upon us
cheers,
Super
------------------------------------------
Too much of good is bad,mix some evil in it
|
|
|
|
|
So I'm to leave your account alone?
No problem, welcome back, here's a
cheers,
Chris Maunder
The Code Project | Co-founder
Microsoft C++ MVP
|
|
|
|
|
Dalek Dave wrote: Why?
Have we upset you?
It is not you, it is me.
|
|
|
|
|
bleedingfingers wrote: It is not you, it is me.
Come on. We all know that means its not me its you.
|
|
|
|
|
Take a breather. Don't come to the site for a couple of weeks....cool off and relax. Come back and it will be OK. I have had a hot head here as well and taking a breather can really help.
Whatever you do, don't delete your account...it's not worth it and it proves nothing.
|
|
|
|